Pickleball Court Lighting Guide
Design standards for the fastest growing sport. Layouts for indoor clubs and outdoor complexes.
Design smarter. Bid faster. Install with confidence. Professional resources for Indoor, Outdoor, Area, and Solar Lighting.
Duvon Lighting’s guide library helps teams plan court and field lighting with clear targets and real-world install guidance. Master footcandle levels, uniformity, glare control, and project costs.
Standards for Indoor Gymnasiums & Outdoor Fields.
Design standards for the fastest growing sport. Layouts for indoor clubs and outdoor complexes.
IES target levels and uniformity requirements for professional and residential tennis facilities.
High-mast configurations, infield/outfield targets, and glare control for competitive play.
Planning for large-scale outdoor pitches with efficient spill-light and glare management.
High-bay requirements, impact resistance, and player safety in indoor athletic environments.
Off-Grid Solar Solutions & Perimeter Area Lighting.
Understanding the ROI and technical specs of self-sustaining solar sports and area lighting.
Design basics for safe, well-lit parking areas, walkways, and industrial perimeters.
High-output LED solutions for 24/7 security and logistical yard operations.
Minimizing light pollution with IDA-certified fixtures for eco-sensitive municipalities.
Engineering Data, IES Targets, and System Controls.
Professional compliance overview of IESNA RP-6-15 for modern facilities.
A reference for recommended footcandle targets from Class I (Pro) to Class IV (Rec).
Optimizing energy usage for gymnasiums and stadiums via smart scheduling.
Interpreting point-by-point light maps, AGi32 simulations, and IES files.
Financial Frameworks and Installation Checklists.
Budgeting for fixtures, poles, foundational work, and electrical labor.
Long-term savings and installation costs of Solar 360 vs. traditional grid power.
Preparation guide for foundation, crane access, and system commissioning.
Send a site plan and our engineering team will deliver a 3D photometric simulation and budget guidance within 48 hours.